Projects
Completed Projects
UGANDA RAIL CORPORATION
Inspection & Stability report
- Inspection & Stability Report
- Client: Uganda Rail Corporation
- Through : M.R. TECHNOFIN CONSULTANTS PRIVATE LIMITED, MUMBAI


IRAI RIVE BRIDGE
Survey investigation and preparation of DPR for Major Submersible Bridge across IRAI River at Chandrapur District. (Span 6 x 30.00m = 180m Length)
- SPAN 6 X 30.00M = 180M LENGTH
- RIVER BRIDGE
- CLIENT: PWD DIVISION NO.1 , CHANDRAPUR
- THROUGH : SHRI. S.D. MULANI ENGINEERS & CONTRACTOR
ROB AT KHAPRI
Design of 46m Railway Span and Lounding Design
- 46m Railway Span
- Design of Launching Scheme
- National Highway Authority of India


Vishnuprayag NH- 7
(Old NH 58)
Construction & Upgradation of Existing Road on NH 07 (Benakuli Bend to Mana) Under Chardham Pariyojna.
- Chardham Pariyojna Project
- National Highway Authority of india
- Preparation of Structural Design & Drawing
Railway Gauge Conversion
Railway Major Bridge Gauge Conversion Work of Nagpur – Chhindwara Section (from NGto BG)
- Total 32 Nos. of Bridge
- Design of 34m High Pier
- Design of 25m High Abutment with Pile Foundation


ROB AT KHAJRI ROAD, CHHINDWARA
DPR Preparation of ROB in Lieu of L.C. No. 18 @ Km. 987/3 on CWA – Amla Section in Nagpur Division.
- Topographis Survey including Geotechnical Investigation
- Preparation of GAD, RCC Design & Drawing and Estimate
- Nagar Palika Nigam, Chhindwara
Buttibori ROB, Nagpur
Launching Scheme Arrangement for PSC Girder for 43m Span Over Railway Portion Nagpur – Buttibori ROB
- Launching Sceme for 43m PSC Girder
- launching Truss 30m , Nose Truss 20m
- Central Railway, Nagpur


ROB AT NH 69
Four Laning of Nagpur – Betul Section of NH -69 (Km. 3.000 to Km. 59.300) in the State of Maharashtra and Madhya Pradesh on BOT (Annuity) Basis. (ROB – Composite Design)
- Launching Scheme. Steel Girder with RCC Deck Slab Substructure with Pile Foundation
- Total 03 Nos. of ROB (ROB 29 | ROB 33 | ROB 38)
- National Highway Authority of India
Main Railway Station, Nagpur
Supporting System at Narrow Gauge Locomotive at Nagpur Main Railway Station.
- Narrow Gauge Engine on Cantilevel Beam with Single Support.
- Central Railway, Nagpiur


Ajni Railway Station, Nagpur
Improvement to Faced and Circulating Area of Ajni Railway Station, Nagpur
- Faced and Circulating Area of Railway Station
- Dome with Steel Structure
- Central Railway, Nagpur
RCC Box Pushing
Box Pushing Method Railway km 235/22-26 on Bih – Bhopal
- Box Pushing Method
- Railway Km. 235/22-26
- Central Railway, Nagpur


Road Bridges
Road Bridges – MPRDC BOT Work
- Design of Minor & Major Bridge 140 Nos.
- Design of RCC Box
- Madhya Pradesh Road Development Corporation (MPRDC).
ROB at New BG Railway Line
ROB at New BG railway Line Between Amravati – Narkhed at Km 42382
- PSC Girder Bridge
- Skew 45 Degree
- Central Railway, Nagpur


Latur River Bridge
High Level Submersible Bridge at Manjra River on State Highway No. 144 at Km 41 in Latur District
- High Level Submersible Bridge
- RCC girder and Pier with Open Foundation
- PWD Aurangabad
Road DPR Work
Topographic Survey, Estimatation and Preparation of DPR of Road and Bridges Under PMGSY & MMGSY – Nagpur and Amravati Region.
- Total 700+ Km DPR Completed
- PMGSY | MMGSY | ADB Funded | PMGSY III Road and Bridges
- MMGSY & PMGSY - Nagpur and Amravati Region


Residential and Commercial Buildings
Residential Township with G+7 Storied Complex, PWD Buildings, Railway Station Buildings.
- Residential & Commercial Buildings
- PWD | RTMNU | Railways etc